Henan Zhengzhou Mining Machinery CO.Ltd

Henan Zhengzhou Mining Machinery CO.Ltd Being genuine; Service taking top priority; Delivery and paying in time.

Manufacturer from China
Verified Supplier
6 Years
Home / Products / Cement Production Line /

Complete Cement Production Plant Electricity Saving Environmental Friendliness

Contact Now
Henan Zhengzhou Mining Machinery CO.Ltd
Visit Website
City:zhengzhou
Province/State:henan
Country/Region:china
Contact Person:MrAndrew
Contact Now

Complete Cement Production Plant Electricity Saving Environmental Friendliness

Ask Latest Price
Video Channel
Brand Name :ZK Corp
Model Number :Cement Clinker Grinding Plant
Certification :ISO,CE
Place of Origin :China
MOQ :1 Set
Price :Negotiable
Payment Terms :L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :10 Per Month
Delivery Time :30days
Packaging Details :Export standard container or as customers' requirements
Capacity :50 t/d-1500 t/d
Main Materials :Clinker,Gypsum,Additives
Main Equipment :Vertical Roller Mill, Cement Ball Mill, Air Classifier
Condition :New
After-sales Service Provided :Engineers available to service machinery overseas
Warranty :12 Months
Spare parts :Supply all using life
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description
Complete Cement Grinding Station / Cement Clinker Grinding Plant

The cement grinding plant mainly used in crushing and preheating of clinkers, and grinding and packaging of cement. And it is mainly applied to deal with industrial solid wastes like slag, coal ash, coal gangues, and so on. Therefore, it contributes great to the environment protection industry.

Our cement grinding plant has the features of simple technological process, easy operation, low investment, electricity saving, environmental friendliness, etc. And various admixtures can also be used in this plant.

Here in Jiangsu Pengfei Group Co., Ltd, one-stop service is available, including engineering design, construction, related equipment, assembly and debugging, technical service, and general contracting service. Besides, we have successfully finished many relevant engineering projects, like the construction of cement grinding plant with an annual output of 1-1.2 million tons, the building of cement grinding plant with 0.5-0.6 million tons' annual output, the construction of 0.2-0.3 million tons' annual output cement plant, and the building of plant with 0.1 million tons' annual output.


Complete Cement Production Plant Electricity Saving Environmental Friendliness

1,000,000Tons/Year Cement Grinding Plant:
In this 1,000,000t/y cement grinding plant, clinker and slag are ground separately. PFG120-50 rolling machine and Φ3.2m×13m cement mill are used in clinker ginding. Φ3.2m×13m ginding machine and high-efficiency powder separator are used in slag grinding.


Complete Cement Production Plant Electricity Saving Environmental Friendliness

This plant features are high quality, high productivity and low consumption.

Process Flow Design of 1,000,000Tons/Year Cement Grinding Plant:
1. Designing of Clinker Grinding Production Line
After gypsum, clinker and limestone are measured by the belt weigher, they will be mixed together in accordance with particular proportions, and then sent to the stable weighing warehouse. During this process, magnetic metals are removed by the iron remover from these materials. Then mixed materials will be sent into the rolling machine to be crushed. After crushed, they will be sent to the powder separator, in which coarse powder will be sent back to the griding mill while the fine one will be sent to the elevator for finished products. Finally, they will be sent to finished product storage. Meanwhile, dusty gas from the grinding mill will be purified by the environmental protection equipment before discharged into the atmosphere.

2. Design of Slag Grinding Production Line
Gypsum, dry slag and pulverized coal are measured by the belt weigher before mixed together according to particular proportions. Mixed materials will be sent to the mill for grinding, and during this process, iron remover is employed to remove magnetic metals in these materials. After grinded, fine powder will be sent to high-efficeint powder separator, while coarse powder will be sent back to the grinding mill. Finished cement will be collected by the air tank pulse bag filter, while the fine powder will be sent to the storage for finished products through an elevator. Dusty gases from the mill will be used as the first gas to enter into the powder concentrator, which is followed by fresh air. Finally, dusty gas will be purified by the air tank pulse bag filter before discharged into the atmosphere.

3. Design of Mixing Fine Slag and Powder Clinker
Besides the fineness of powder clinker and fine slag in the grinding production line, accurate measuring and even mixing also need to be paid much attention to. That's why we choose to use the screw measurer as the measuring device and the air slide as mixing device as well as conveying device.

CONFIGURATION

Capcity 25t/d 50 t/d 100 t/d 150 t/d 200 t/d
Rotary kiln Specification Φ1.4×33m Φ1.6/1.9×36m Φ2.2×45m Φ2.5×50m Φ3×60m
Capacity 1t/h 2t/h 4t/h 6t/h 8t/h

Calcination

Temperature

(℃)

1450 1450 1450 1450 1450
Raw mill Specification

Φ1.2×4.5m

Open circuit

Φ1.5×5.7m

Open circuit

Φ1.83×6.1m Open circuit

Φ1.83×6.1m

Closed circuit

Φ2.2×6.5m

Closed circuit

Capacity 1.7t/h 4.5t/h 9t/h 12t/h 16t/h
Motor power 55kW 130kW 210kW 210kW 310kW
Cement mill Specification Φ1.2×4.5m Open circuit

Φ1.5×5.7m

Open circuit

Φ1.83×6.1m Open circuit

Φ1.83×6.1m

Closed circuit

Φ2.2×6.5m

Closed circuit

Capacity 1.4t/h 3.5t/h 6.5t/h 8t/h 12t/h
Motor power 55kW 130kW 210kW 210kW 310k
Inquiry Cart 0